ƶijϻ

TDI-Brooks Completes Phase Four of Deepwater Geotechnical Project in Black Sea

Credit: TDI-Brooks
Credit: TDI-Brooks

TDI-Brooks said Thursday it had completed phase four of a deepwater geotechnical coring and CPT project for DenAr Ocean Engineering S.A. 

TDI-Brooks used its Jumbo Piston Cores (JPC) and CPT Stinger geotechnical tools and operators to the ongoing project off Turkey in the Black Sea.

The PROTEUS is outfitted with TDI-Brooks’ complete geotechnical tool kit, including a suite of innovative geotechnical tools for soil sampling and CPT measurement. The PROTEUS also has a Kongsberg EM-710 (1×1) hull-mounted multibeam (MBES) for surveys to ~2,500m water depth for performing surface geochemical “seep-hunting” (SGE) and seabed heat flow surveys (HF).

TDI-Brook’s R/V PROTEUS is now available for other projects in the Mediterranean and/or Southwest Europe region.

Current News

Seatrium, Höegh Evi Agree LNG Tanker Conversion Job into FSRU Bound for Egypt

Seatrium, Höegh Evi Agree LNG

Agogo FPSO to Reach Azule Energy’s Field off Angola in Mid-May (Photos)

Agogo FPSO to Reach Azule Ener

Fugro’s Group Director for Europe and Africa Resigns

Fugro’s Group Director for Eur

Petrobras Reports 48.6$ Profit Rise for First Quarter 2025

Petrobras Reports 48.6$ Profit

Subscribe for OE Digital E‑News