ƶijϻ

Enauta Resumes Production from Atlanta Field After Brief Shutdown. 2H Well Still Shut

©Enauta
©Enauta

Brazilian oil firm Enauta has restarted production from its Atlanta field offshore Brazil following a brief interruption. However, the 2HP well, which was shut down on Tuesday, is still closed.

First, the company on Tuesday said that it had temporarily interrupted the production of the Atlanta field and was evaluating the causes of the interruption. 

The company said Tuesday that preliminary assessments indicated failure of subsea equipment associated with the 7-ATL-2HP-RJS well (“2HP”), and,  said that production from two other wells would resume later in the day. 

On Wednesday, Enauta said that production of the 7-ATL-4H-RJS (“4H”) e 7-ATL-5H-RJS (“5H”) wells of the Atlanta Field (“Field”) was resumed Tuesday, as expected.

"The 7-ATL-2HP-RJS (“2HP”) well remains inoperative and must have its pump replaced by a reserve pump, with the return to production scheduled for the month of June, after the planned shutdown. Currently, the production at the field is approximately 12 thousand bbl/d and is still ramping up," Enauta said.

Interestingly, this is not the first instance of the 2HP offshore well being shut down. In March, production from the well had been halted, and it had only resumed a week ago after the installation of a new pump on the seabed, before being shut down again on Tuesday.

Enauta produces oil from the Atlanta field using the Petrojarl I FPSO, which has a production capacity of 30,000 barrels of oil per day and a storage capacity of 180,000.

 

Current News

Industry Leaders Set to Discuss Future of US ƶijϻ CCS Market

Industry Leaders Set to Discus

Polish Shipbuilder Lays Keel for DOF’s New ƶijϻ Support Vessel

Polish Shipbuilder Lays Keel f

ADNOC Partners with ExxonMobil, Occidental to Boost UAE Oil and Gas Capacity

ADNOC Partners with ExxonMobil

Estonia Grants First ƶijϻ Wind Construction Permit

Estonia Grants First ƶijϻ

Subscribe for OE Digital E‑News