ƶijϻ

First Gas Flows from DeNovo's Zandolie Field ƶijϻ Trinidad & Tobago

Credit: DeNovo
Credit: DeNovo

First gas has started flowing from DeNovo Energy's Zandolie field offshore Trinidad & Tobago, developed using a wind- and solar-powered unmanned platform.

Zandolie, which took $52 million to develop, is DeNovo's second offshore field development to be completed in Block 1 (a) on the West Coast of Trinidad.

Zandolie is a single well, conductor-supported platform with a nameplate capacity of 40 MMSCFD. 

"The field development builds off the existing Iguana Infrastructure enabling a more compact topside structure that is lighter and more efficient. The space-saving achieved also minimizes the use of steel in the design allowing for a modular design and greater use of local fabrication services, " DeNovo said.

"Powered by wind and solar, the 100% renewably powered platform was also fully fabricated in-country, affirming DeNovo's commitment to reducing its carbon footprint and maximizing local talent and resources. The facility has also been designed to prevent methane slip in the transportation of gas during the extraction process and in its movement to DeNovo's on-shore gas processing facility within the Point Lisas Industrial Estate," DeNovo said.

Construction of the platform was completed at the United Engineering Services Limited (UESL) local fabrication yard, and the Zandolie Drilling campaign was conducted by the local Well Services Rig 110.

 

Current News

Eni Starts Gas Production at Merakes East Field in Indonesia

Eni Starts Gas Production at M

Green Marine Poised for Growth Alongside Potential UK Marine Energy Surge

Green Marine Poised for Growth

InterMoor Completes Studies for UK Floating Windfarm Development

InterMoor Completes Studies fo

TotalEnergies, BW Energy to Decide on Namibia Projects in Late 2026

TotalEnergies, BW Energy to De

Subscribe for OE Digital E‑News