ƶijϻ

FloaTEC mates hull, topsides for Petrobras' P-61

FloaTEC (S)Pte Ltd successfully completed the mating operation of the topsides and hull of Petrobras P-61, Brazil’s first Tension Leg Wellhead Platform (TLWP) near shore to BrasFELS yard in Angra Dos Reis, Brazil.

The P-61 TLWP, which uses FloaTEC’s ETLP proprietary design, is being built at BrasFELS by FloaTEC (a 50/50 Joint Venture between Keppel O&M and subsidiary of McDermott), will be installed later this year at the Papa Terra field for PPT BV Papa Terra  BV- a Joint Venture between Petrobras and Chevron.

During the topsides-to-hull mating operation, FloaTEC towed the four-column hull from the BrasFELS yard to a deepwater mating hole nearby close to the Angra dos Reis yard, and ballasted it to the required mating draft. The topsides mounted on a specially built float-over barge was towed offshore and positioned over the hull. Upon deballasting, the hull gradually emerged from the water and connected with the topsides via specially designed receptacles and stab-in cones. Once the two structures were successfully connected, the float-over barge was removed from below the topsides completing the offshore mating of the first locally built TLWP for Brazil. 

Current News

Industry Leaders Set to Discuss Future of US ƶijϻ CCS Market

Industry Leaders Set to Discus

Polish Shipbuilder Lays Keel for DOF’s New ƶijϻ Support Vessel

Polish Shipbuilder Lays Keel f

ADNOC Partners with ExxonMobil, Occidental to Boost UAE Oil and Gas Capacity

ADNOC Partners with ExxonMobil

Estonia Grants First ƶijϻ Wind Construction Permit

Estonia Grants First ƶijϻ

Subscribe for OE Digital E‑News