ƶijϻ

Höegh selected for FLNG FEED

Höegh LNG has signed a contract with an Asia based national oil company to conduct pre-front-end engineering design (FEED) engineering work for an offshore floating LNG facility (FLNG) with a two million-tonne per annum production capacity. 

The work will be finalised in the first quarter of 2014. Provided that the conclusion of the engineering work is positive, the intention of the client is to execute a full FEED in the first half of 2014.

In July, Höegh FLNG, a fully owned subsidiary of Höegh LNG, was awarded a pre-FEED study for a jetty-moored 2 mtpa FLNG near shore barge FLNG solution for a North American LNG export project. The study will be executed in 2H 2013 with a potential for conducting a full FEED in 2014.

Current News

Stakeholders Wary of Partial Decommissioning of ƶijϻ Wind Farms

Stakeholders Wary of Partial D

ADNOC’s XRG Partnres Up with Petronas for ƶijϻ Gas Block in Caspian Sea

ADNOC’s XRG Partnres Up with P

First European Built CO2 Carrier for CCS Projects Officially Launched

First European Built CO2 Carri

CorPower Ocean to Develop 5MW Wave Energy Farm off Scotland

CorPower Ocean to Develop 5MW

Subscribe for OE Digital E‑News