ƶijϻ

Delays in Store for Two Wells at Shell’s Perdido Development

Monday, May 12, 2025

Shell, the top U.S. offshore producer, said this week that two of its wells to boost production at the Perdido offshore development were delayed to the end of the year, while one was brought online in March.

All three wells, part of Perdido's Great White unit, were originally expected to be online in April and set to produce up to 22,000 barrels of oil equivalent per day (boepd) at peak rates, expanding output from the platform.

Perdido, which began production in 2010, has an output capacity of 125,000 boepd at peak rates. Shell is the operator of the field with a 35% working interest, while Chevron CVX.N and others hold the remaining stake.

Shell in December had also announced plans to bring online two additional wells as a part of the Silvertip unit to boost Perdido's output. These wells are expected to collectively produce up to 6,000 boepd at peak rates, with first oil expected in 2026.


(Reuters - Reporting by Arathy Somasekhar in Houston)

Categories: Drilling Industry News Activity North America Gulf of Mexico Oil and Gas Gulf of America

Related Stories

Pemex Considers Reactivating Old Wells to Boost Oil Output

EnerMech Gets LLOG’s Gulf of America Pre-Commissioning Job

BP Hires SBM ƶijϻ to Install Kaskida FPU in Gulf of America

Current News

Erik-Jan Bijvank to Step Down as Fugro’s Group Director Europe and Africa

Bardex Technical Sales Engineer Selected for 2025 OTC Class of Emerging Leaders

US Firm Debuts 20K Intervention Solution at Gulf of America Deepwater Field

Brava Cancels Sale of Shallow Water Assets in Brazilian State

Subscribe for OE Digital E‑News