ƶijϻ

Strohm, UNITECH Unite for Enhanced Subsea Pipeline Solutions

Wednesday, February 19, 2025

Thermoplastic composite pipe (TCP) manufacturer Strohm, and provider of subsea connection systems UNITECH ƶijϻ have signed a memorandum of understanding (MoU) to develop and commercialize an integrated system for the transportation of fluids and gases.

Under the MoU, the two companies are creating a subsea, end-to-end jumper connection solution without flange which reduces the risk of leaks and simplifies the installation process.

UNITECH’s connector will be integrated with Strohm’s TCP end-fitting, creating a flange-less interface.

“By joining forces with UNITECH ƶijϻ, we develop an integrated system that not only simplifies installation, but also ensures long-lasting flange-less performance in the most challenging conditions,” said Martin van Onna, Strohm’s CEO.

“This collaboration underscores our commitment to advancing subsea connectivity with engineered simplicity.

“By integrating our robust, installation-friendly UH-500 Series connector with Strohm’s thermoplastic composite pipe, we are providing a seamless, flange-less system that further enhances installation efficiency while ensuring reliable, high-pressure performance across a wide range of subsea applications,” added Frode Hellesøe, CEO of UNITECH ƶijϻ.

Categories: ƶijϻ Energy Subsea Pipelines Industry News Activity Europe Oil and Gas

Related Stories

TGS Starts Summer Acquisition Activities in North Europe

Newbuild USV Challenger Getting Ready for Remote-Controlled Subsea Work

Sentinel Subsea Completes Well Monitoring Job in North Sea

Current News

National Grid Takes $402 Million Hit on Paused New York Wind Project

Libya's Latest Oil and Bidding Round Attracts Over 40 Applicants

Mitsui’s STATS Rolls Out Titanium Connector for Oil and Gas Sector

Indonesia Grants Approval to Kuwaiti Firm for Anambas Block in Natuna Sea

Subscribe for OE Digital E‑News