ƶijϻ

HSM Rolls Out Topside for ONE-Dyas’ ƶijϻ Wind-Powered Gas Platform

Tuesday, April 16, 2024

HSM ƶijϻ Energy has rolled out the topside for ONE-Dyas’ N05-A platform, which, once fully constructed, will be the first electrified gas production platform in the North Sea that runs completely on offshore wind power.

HSM reached the milestone at its yard in Schiedam, the Netherlands, merely two days after the successful lift of the upperpart of the jacket on its lower counterpart. These project achievements represent an important step in harnessing local Dutch offshore energy resources.

Once completed, the N05-A Platform will be the first electrified gas production platform in the North Sea, which will run entirely on offshore renewable energy from the nearby Riffgat ƶijϻ Wind Farm.

With cutting-edge technology and innovative design, this topside heralds a new era to HSM ƶijϻ Energy’s commitment to accelerate local Dutch gas production and to offshore energy transition..

ONE-Dyas, a prominent Dutch player in the exploration and production of gas in the North Sea, has partnered with HSM ƶijϻ Energy for the project back in 2022.

The N05-A Topside is prepared to enhance ONE-Dyas's operations, optimizing production efficiency and minimizing environmental impact.

The oil and gas company sanctioned the €500 million N05-A gas field development in September 2022, saying at the time that the project was the largest investment in a natural gas development in the Netherlands in the past 15 years.

The N05-A platform location will be located about 20 kilometers north of the islands of Borkum, Rottumerplaat, and Schiermonnikoog.

"The N05-A Topside is a milestone for our company. It embodies our dedication to innovation, sustainability, and operational excellence. Local gas production is key for the Dutch economy and needed to smoothen the energy transition,” said Hans Leerdam, Commercial Director of HSM ƶijϻ Energy.

"We are glad to execute such significant energy projects in the Netherlands. The retention of knowledge and infrastructure within the country is crucial as we navigate the energy transition.

“Our collaboration with HSM ƶijϻ Energy and other involved partners serves as an exemplary model of the Dutch manufacturing economy in action,” added Chris de Ruyter van Steveninck, CEO of ONE-Dyas.

Categories: Engineering North Sea Industry News Activity Europe Oil and Gas Electrification

Related Stories

NSTA, Crown Estate Scotland Team Up for North Sea Opportunities

Aker BP Secures Drilling Permit for Multiple Wildcat Wells in North Sea

TWMA Hooks ‘Major Contract’ with BP in North Sea

Current News

Industry Leaders Set to Discuss Future of US ƶijϻ CCS Market

Polish Shipbuilder Lays Keel for DOF’s New ƶijϻ Support Vessel

ADNOC Partners with ExxonMobil, Occidental to Boost UAE Oil and Gas Capacity

Estonia Grants First ƶijϻ Wind Construction Permit

Subscribe for OE Digital E‑News