ƶijϻ

Manor to Build ƶijϻ Wind Service Vessel for Mainprize

Wednesday, July 21, 2021

UK-based shipbuilder and marine services provider Manor Marine has won an order to build a multi-role offshore wind farm service vessel.

The 26-meter Supa Swath catamaran, designed by Walker Marine Design, was ordered by Mainprize ƶijϻ. Manor Marine expects to deliver it in the second quarter of 2022.

This will be the sixth crew transfer vessel constructed by Manor Marine, but the first vessel built for Mainprize ƶijϻ.

It will feature a Supa-Swath hull form, with a 175m2 of deck space, a cargo capacity of 35 tonnes, and will offer seating for 24 passengers and a maximum speed of 27 knots.

Bob Mainprize, Managing Director at Mainprize ƶijϻ said, “We do not only operate vessels, but we are also highly involved with the vessel design from concept to delivery; detailed weight control is included in the specifications to ensure the shipyard delivers a quality product.

"The drive for technically efficient, terrifically optimized vessels which can do much more in less time has been the mainstay of Mainprize ƶijϻ's fleet."

Leif Cooper, Managing Director at Manor Marine said the vessel would be the first to be built in the company's newly acquired 2000m2 high-speed vessel workshop.

Manor Marine did not share the financial details of the deal.

Categories: ƶijϻ Vessels Europe ƶijϻ Wind Crew Transfer Vessels

Related Stories

Newbuild USV Challenger Getting Ready for Remote-Controlled Subsea Work

North Star Takes Delivery of its First CSOV (Video)

EMGS Diversifies Business with Siem Day Subsea Construction Vessel Buy

Current News

Industry Leaders Set to Discuss Future of US ƶijϻ CCS Market

Polish Shipbuilder Lays Keel for DOF’s New ƶijϻ Support Vessel

ADNOC Partners with ExxonMobil, Occidental to Boost UAE Oil and Gas Capacity

Estonia Grants First ƶijϻ Wind Construction Permit

Subscribe for OE Digital E‑News