ƶijϻ

TECH: KENC Engineering Lifting Tool for ƶijϻ Wind

MarineLink
Wednesday, November 18, 2020

Van Oord awarded Breman Machinery and KENC Engineering with the assignment to design and build a casing lifting adapter (CLA). The lifting tool supports the installation of 190 pin piles at Saint-Brieuc offshore wind farm.

The CLA can handle 275 tonnes and is designed to connect with the temporary casing used during drilling operations. It is equipped with redundant safety pin connections and can be operated remotely. The lifting tool includes a sub-sea IP camera to provide real-time images during fitting operations. In early February 2021 the CLA will be delivered to Van Oord.

Categories: ƶijϻ Heavy Lift

Related Stories

Petrobras Seeks Foreign Partnerships with Brazilian Shipyards

Beacon ƶijϻ Energy Expects First Oil From Shenandoah System in June

ABS, Akselos Deepen FPSO Digital Twin Tech Collaboration

Current News

Industry Leaders Set to Discuss Future of US ƶijϻ CCS Market

Polish Shipbuilder Lays Keel for DOF’s New ƶijϻ Support Vessel

ADNOC Partners with ExxonMobil, Occidental to Boost UAE Oil and Gas Capacity

Estonia Grants First ƶijϻ Wind Construction Permit

Subscribe for OE Digital E‑News