ƶijϻ

Swan Hunter Completes MOG Project

Laxman Pai
Wednesday, May 22, 2019

UK-based shipbuilding design, engineering, and management company Swan Hunter, along with partners DOC, have successfully completed load-in spooling operations for the Elia Modular ƶijϻ Grid (MOG) project.

The contract was awarded to load-in and store 5km of the Modular ƶijϻ Grid spare export cable from the new-build Tideway Living Stone cable lay vessel.

Swan Hunter’s newest equipment fleet addition, the 1000Te modular carousel system was used in conjunction with a 15te shoreside tensioner, and loading lower, to spool the cable. The liftable modular basket will be moved to final long term storage location with SPMTs later this month.

Director, Gerard Kroese stated: “This is another fantastic example of well-executed project operations at our cable storage and spooling yard, which places it firmly on the map within the european offshore wind services supply chain."

Gerard added: "To have another flagship cable lay vessel at the yard, the Living Stone, which is brand new to the market, further confirms the flexibility and capability of our strategically placed facility and it’s attraction to installation contractors and offshore windfarm developers active in the market”.

Categories: ƶijϻ Energy Operations

Related Stories

Seatools Gets Fengmiao 1 ƶijϻ Wind Job from CDWE

SKF to Deliver PTO System for Australian Wave Energy Developer

Sentinel Subsea Completes Well Monitoring Job in North Sea

Current News

Industry Leaders Set to Discuss Future of US ƶijϻ CCS Market

Polish Shipbuilder Lays Keel for DOF’s New ƶijϻ Support Vessel

ADNOC Partners with ExxonMobil, Occidental to Boost UAE Oil and Gas Capacity

Estonia Grants First ƶijϻ Wind Construction Permit

Subscribe for OE Digital E‑News