ƶijϻ

Filanovsky topsides work starts

OE Staff
Monday, December 30, 2013

Astrakhan’s Krasnye Barrikady shipyard has started constructing the living quarter platform (LQP-2) for the second stage of Vladimir Filanovsky field developed by LUKOIL in the Russian sector of the Caspian Sea.

The shipyard will construct two bearing blocks, the topside of the LQP and a catwalk bridge to connect the LQP-2 and the ice-resistant platform (IRP-2).

The LQP-2 will accommodate 55 people and include a helicopter pad.The LQP-2 is to be commissioned in the autumn of 2016.

Categories: Engineering Russia Arctic Construction Fabrication

Related Stories

Scarborough FPU's Topsides and Hull Come Together in Major Engineering Feat (Video)

ABS, Akselos Deepen FPSO Digital Twin Tech Collaboration

Solstad’s AHTS Vessel Set for Petrobras Job

Current News

Estonia Grants First ƶijϻ Wind Construction Permit

Karoon Energy Completes Acquisition of FPSO Operating off Brazil

NSTA, Crown Estate Scotland Team Up for North Sea Opportunities

Strategic Move Brings Decom Engineering's Base to Aberdeen

Subscribe for OE Digital E‑News